![]() DERs take some degree of responsibility for system support, which depends on suitable regulatory environments and connection agreements. Distribution system operators (DSOs) have the possibility of managing the electricity flows using a flexible network topology. With these systems in place, the AND becomes an Active Distribution System (ADS). Active distribution networks (ADNs) have systems in place to control a combination of distributed energy resources (DERs), defined as generators, loads and storage. Specifically, the report starts from a survey of requirements of planning methodologies and identifies a new framework and methodologies for short, medium and long term models for active distribution planning. ![]() ![]() This report assesses the various requirements to facilitate the transition towards active distribution systems (ADSs). In this context, the C6.19 Working Group (WG) is specifically focused on “Planning and optimization methods for active distribution systems”. The CIGRÉ C6 Study Committee (Distribution Systems and Dispersed Generation) considers the different aspects of integration of distributed generation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |